Its been a while and i have since done a bit more work to the boat. Hull liner in cabin is finished. Made two hatchws for the chain locker and electrical cabinet. Installed the anchor whinch and hydraulic trim tabs. Time to enjoy the boat this summer.
The Milan Boat Project
Monday, October 27, 2014
Sunday, January 26, 2014
Sunday, November 24, 2013
Upholstery
Managed to find some time to work on the upholstery this weekend. I am installing the carpet and hull liner myself but had to get the profesionals to finish off the vinyl side panels and engine cover.
Sue from Custom yacht covers is doing a great job !!
Monday, November 4, 2013
She is alive ...
It's been a very productive weekend. I installed the rub rail, which has been sitting on my garage floor for the last 3 months. I also started the engine for the first time and it's been a relief hearing that engine roar.
Sunday, October 27, 2013
Shopping and upholstery ...
Over the last few weeks I was busy building the timber panels for the upholstery. I also manged to pick up a stainless steel bimini with sunbrella canvas, which came off a cobalt boat and lucky for me fits perfectly on my boat. Also u managed to find an almost new maxwell rc8 anchor winch for a bargain price.
It's all coming together .....
Saturday, September 28, 2013
And she doesn't fit anymore .....
It's been an eventful weekend and after hours of hard work and determination I finished the engine alignment. It was the hardest job I had to do so far. Hopping in and out of the boat every time I turn the agustment a quater of a turn. But in the end I got it as close as I could possibly get it and the installed the out drive. This was another challenge on its own since it's all new the I rings are very tight to go past the gimbal bearing. But a useful tip a volvo mechanic told me was to hit the starter and it will slide right in. And it sure did.
Now with the outdrive on the boat is too long to fit in my garage and too wide to go past the rear door and park it the back yard. I need a new shed and a wider drive way. (Might have to borrow some from the ensuite and laundry) in sure she will not be happy with that.
Next job is control cables and upholstery panels.
Wednesday, September 25, 2013
Dash installation
Subscribe to:
Posts (Atom)